Building Permits in ZIP 10016
Manhattan, NY — 1,066 permits filed recently
1,066 permits
Facade Restoration & Inspection
NYU - Infrastructure Package - INSTALLATION LOCATION OF BOILERS, BOILER CALCULATIONS, SCHEDULES, DETAILS AND CONTROLS.
Herewith file plans for interior renovation of an existing dwelling unit 7g located on seventh floor. work will include new partitions, floor and celing with new finishes throughout space. no change i...
Equipment use: dual 7000 # capacity personnel hoists during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. ele...
Installing mechanical system for apartment as per plan. no change in use, egess, or occupancy under this filing.
Interior renovation of existing apartment 14D.No change in egress occupancy and use.
Sprinkler modifications taking place on 18th and 19th floors as per plans filed herewith. no change in use, egress, or occupancy.
Propose legalization existing demolition works at 9th floor as per plan, no change in use, egress and occupancy.
Proposed interior renovation works on the 9th floor as per plan. no change in use, egress, and occupancy.
Propose legalization existing demolition works at 9th floor as per plan, no change in use, egress and occupancy.
NYU - Infrastructure Package - INSTALLATION LOCATION OF BOILERS, BOILER CALCULATIONS, SCHEDULES, DETAILS AND CONTROLS.
Installing mechanical system for apartment as per plan. no change in use, egess, or occupancy under this filing.
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.
Interior renovation of existing apartment 14D.No change in egress occupancy and use.
Facade Restoration & Inspection
Equipment use: dual 7000 # capacity personnel hoists during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. ele...
Sprinkler modifications taking place on 18th and 19th floors as per plans filed herewith. no change in use, egress, or occupancy.
Application being filed under TPPN #3/97 to combine apartments 4B and 4B on the 4th Floor. Work to include removal of kitchen and capped at 4B to have 1 open kitchen. No change in use, egress, or occu...
Sprinkler work at 1st floor as per plan filed here with. no change in use, egress or occupancy.
Filing herewith for use of mechanical means DS1 in conjunction with application #M01227502-I1. No change in use, egress, or occupancy.