Building Permits in ZIP 10016
Manhattan, NY — 1,066 permits filed recently
1,066 permits
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Construction equipment- sidewalk- shed proposed installation of heavy-duty sidewalk shed. no change in use occupancy or egress under this application, live load 300 # per square feet. sidewalk shed sh...
Interior work on floor 2-15; including the upgrading of interior furnishings and finish of hotel guestrooms and corridors. no change in use, egress or occupancy.
Light duty sidewalk shed for emergency condition. no change in use, egeress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
minor non load partition wall and door in apt#11E. no change in use, egress or occupancy.
Installation of temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Minor Soft Demo of non-load bearing partitions as per plans filed herewith. Our scope of work will not impact any ACM. No change in use, egress or occupancy.
Application filed for mechanical additions/modifications on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Concrete parking structure repairs. no change in use, egress or occupancy.
Restore structural integrity of existing brick wall at the corner.
Installation of sidewalk shed in accordance with nycc 2014 chapter 33. no change in egress, use, or occupancy.
Installation of pipe scaffolding and engineered enclosure as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Additions/Modification to the existing plumbing system on the 18th Floor-Suite 1801 ( Viabizzuno Ste) as per plans. No change to use, egress or occupancy.
Installation of sidewalk shed in accordance with nycc 2014 chapter 33. no change in egress, use, or occupancy.
Minor Soft Demo of non-load bearing partitions as per plans filed herewith. Our scope of work will not impact any ACM. No change in use, egress or occupancy.
Concrete parking structure repairs. no change in use, egress or occupancy.
Installation of temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of pipe scaffolding and engineered enclosure as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.