Building Permits in ZIP 10016
Manhattan, NY — 1,066 permits filed recently
1,066 permits
Modifications to sprinkler system on partial 4th floor as per plans. No change to use, egress or occupancy.
Structural repairs for tenant space facing 39th street as per plans. No change to use, egress or occupancy.
Modifications to mechanical system on partial 4th floor as per plans. No change to use, egress or occupancy.
Sprinkler modifications taking place on floors 2, 4, 5, 6 as per drawings filed herewith. no change in use, egress or occupancy.
Application filed for plumbing additions/modifications on the 10th floor (suite 1002) as per plans filed herewith. no change in use, egress, or occupancy.
Chute Installation
Modifications to mechanical system on partial 4th floor as per plans. No change to use, egress or occupancy.
Structural repairs for tenant space facing 39th street as per plans. No change to use, egress or occupancy.
Engineered Enclosure System
Installation and use of temporary hoist for facade repairs as per plans filed herewith. no change to use, egress, or occupancy under this application.
Filing for the removal of existing mechanical equipment as per plans filed herewith.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
General construction modifications taking place on floors 2, 4, 5, 6 as per drawings filed herewith. no change in use, egress or occupancy.
Non-illuminated non-advertising accessory storefront awning - apollo bagels. no change of use, egress or occupancy.
Application filed herewith for a temporary construction office & shanties on the cellar, ground floor, and second floor. no change in occupancy use or egress underthis application.
Subsequent filing for replacement/new plumbing fixtures for an existing dwelling unit 7g. no change in use, egress and occupancy.
Modifications to sprinkler system on partial 4th floor as per plans. No change to use, egress or occupancy.
Mechanical Equipment Use for Interior Demolition
Application filed for sprinkler additions/modifications on the 10th floor (suite 1002) as per plans filed herewith. no change in use, egress, or occupancy.
At first floor, modification to egress and egress door/facade assembly. no change in use or occupancy,