Building Permits in ZIP 10016
Manhattan, NY — 1,053 permits filed recently
1,053 permits
Subsequent filing for plumbing work in conjunction with alt-co applicaiton # m01053870.
Herewith filing structrual work as per plans. no change in use, egress or occupancy.
Installation of outriggers for facade repair and inspection.
Herewith for the removal of existing automated parking system and its structure and the filling in of the resulting 2nd floor opening with new floor structure to support new ed expansion.
ICG Capital / Robeco Turnkey - Plumbing work on the 21st floor as indicated on drawings.
Proposed renovation of existing kitchen and bedroom hall closet.
Modification of existing sprinkler system as per plan. no change to use, egress or occupancy proposed. filed in conjunction with 110366443, m01330947, m01330949, m01328048
At 2nd floor tenant space, new sprinkler system as per plans filed herewith. no change in use, occupancy or means of egress.
Construction of a new 19 story building. construction class 1-b, mixed use building.
Lobby renovations (323 E. 34th Street entrance) - Sprinkler work on the 1st floor as indicated on drawings.
Proposed installation of plumbing fixtures and associated piping and modification of sprinkler system, all as per plans. No change to use , egress or occupancy.
Nyu langone - science building fish quarantine reno - modifications to an existing sprinkler system as per plans filed herewith. no change in use, egress, or occupancy.
Minor interior renovation on Unit 6J, no changes in use, egress or bulk under this application.
Installation of ADA ramp on main roof level, no change to use occupancy or egress.
Lobby renovations (323 E. 34th Street entrance) - Sprinkler work on the 1st floor as indicated on drawings.
Installation of ADA ramp on main roof level, no change to use occupancy or egress.
Modification of existing sprinkler system as per plan. no change to use, egress or occupancy proposed. filed in conjunction with 110366443, m01330947, m01330949, m01328048
Minor interior renovation on Unit 6J, no changes in use, egress or bulk under this application.
Proposed installation of plumbing fixtures and associated piping and modification of sprinkler system, all as per plans. No change to use , egress or occupancy.
Nyu langone - science building fish quarantine reno - modifications to an existing sprinkler system as per plans filed herewith. no change in use, egress, or occupancy.