Building Permits in ZIP 10016
Manhattan, NY — 1,053 permits filed recently
1,053 permits
Removal of of existing landscape area, granite curb, stone wall, and bollards and Installation of new landscaping, concrete egress area, additional detention to handle new impervious area and new park...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occupancy or egress under...
Filing for interior alterations general construction work to modify an existing area on the ground floor level of Bellevue Hospital for New GE Radiology Equipment.
Plumbing and sprinkler systems installation as shown on plans filed herewith. no change in use, egress, or occupancy.
Infill existing stair and provide new framing and concrete slab on metal deck on partial 22nd floor as per plans. No change to use, egress or occupancy.
Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
General construction as shown on plans filed herewith. No change in use, egress or occupancy.
installation of 4 ac sleeve in apartment 9E. No change in egress use or occupancy.
installation of 3 ac sleeve in apartment 8E. No change in egress use or occupancy.
General construction for interior renovation of Apartment 7A on the 7th floor, as shown on drawings filed herewith. No change in use, egress, or occupancy.
Roof replacement, window replacement, elevator rehab and boiler replacement, localized fisp work, aging in place in localized apartments as per plans filed herewith. no change in use, egress, or occup...
Installation of engineered enclosure system (BC 3309.17) on cantilevered steel beams as per plans.
Subsequent filing of pl and sp. no change in use, egress or certificate of occupancy.
Subsequent filing of pl and sp. no change in use, egress or certificate of occupancy.
Installation of temporary shoring posts to support the vault framing and concrete slabs in areas of deterioration until the vault framing can be replaced.
PLUMBING WORKS AS SHOWN IN PLANS AT APT 11K ON THE 11th FLOOR. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
INTERIOR RENOVATION OF APT 11K ON THE 11th FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
installation of 3 ac sleeve in apartment 8E. No change in egress use or occupancy.
Filing for interior alterations general construction work to modify an existing area on the ground floor level of Bellevue Hospital for New GE Radiology Equipment.
General construction as shown on plans filed herewith. No change in use, egress or occupancy.