Building Permits in ZIP 10016
Manhattan, NY — 1,061 permits filed recently
1,061 permits
Suspended Scaffold for Facade Restoration and Inspection as shown on Plans
Plumbing work in partial 22nd floor as per plans. No change to use, egress or occupancy.
Replacement of split system on floor 014 and the roof with a total capacity of 4 tons. no change to egress, use, or occupancy.
Facade Restoration Via Suspended Scaffolding & Inspection
Application filed for mechanical modifications/additions on the 2nd floor as per plans filed herewith. no change in use, egress or occupancy
Plumbing work in partial 22nd floor as per plans. No change to use, egress or occupancy.
Replacement of split system on floor 014 and the roof with a total capacity of 4 tons. no change to egress, use, or occupancy.
Minor interior renovation on Unit 11N, no changes in use, egress or bulk under this application.
Facade Restoration Via Suspended Scaffolding & Inspection
Application filed for mechanical modifications/additions on the 2nd floor as per plans filed herewith. no change in use, egress or occupancy
Suspended Scaffold for Facade Restoration and Inspection as shown on Plans
Installation of a temporary construction fence as per plans. no change in use, egress or occupancy under this application. fence to comply with 2014 nyc building code, chapter 33.
Installation of a temporary scaffold as per plans. no change in use, egress or occupancy. scaffold installed in accordance with 2022 nyc building code, chapter 33.
subsequent filing to do plumbing work in conjunction with Alteration (GC) application
Plumbing work filed in conjunction with the renovation of an existing dwelling uni. Architectural, mechanical and structural work filed under separate applications. No change in use, occupancy or egre...
Structural modifications as per plans filed herewith. General construction. Handrail support steel. Modernfold support steel. No change of use, occupancy or egress.
Plumbing changes on the 8th floor as indicated on drawings.
Sprinkler work as shown on the plans.
Sprinkler changes on the 8th floor as indicated on drawings.
Installation of suspended scaffold for facade work and/or inspection. Amend #2, added anchor detail masonry