Building Permits in ZIP 10016
Manhattan, NY — 1,061 permits filed recently
1,061 permits
Installation of suspended scaffold for facade inspection/ repair.
At 3rd floor tenant space, new sprinkler system as per plans filed herewith. no change in use, occupancy or means of egress. related filings m01261898,m01261900,m01261904
Facade and roof repairs as indicated on the plans filed herewith. no change in use, egress, or occupancy.
Replace boiler and oil burner in heating plant.
Construction of non-load bearing partitions. no change in egress, use or occupancy.
INSTALLATION OF 35' NEW SIDEWALK SHED AT 13 E 30th STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
Replacement 5,000 gallon oil tank.
Filing for gc scope related to installation of new rough plumbing and plumbing fixtures. plumbing, sprinkler, and mechanical work types to be filed under separate applications. no change in use, occup...
Replace boiler and oil burner in heating plant.
Installation of suspended scaffold for facade inspection/ repair.
At 3rd floor tenant space, new sprinkler system as per plans filed herewith. no change in use, occupancy or means of egress. related filings m01261898,m01261900,m01261904
Facade and roof repairs as indicated on the plans filed herewith. no change in use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Plumbing work on the Cellar and 1st Floor as per plans filed. No change to use, egress or occupancy is involved.
Filing for the modification of existing fire protection system for the removal and installation of sprinkler head on existing branch piping.
Sprinkler work in partial 22nd floor as per plans. No change to use, egress or occupancy.
Erect, maintain & dismantle of scaffold for facade repairs per drawings attached herewith.
Propose to perform sprinkler work. No change to use, egress or occupancy.