Building Permits in ZIP 10016
Manhattan, NY — 1,053 permits filed recently
1,053 permits
Interior renovation at existing hotel lobby on 1st floor as per the plan filed herewith. no change in use, occupancy or egress.
Filing interior renovation of 26th floor office space as per plans. Interior demolition filed under #M01236904-I1. No change in use, egress, or occupancy under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Nyu langone - steam exhaust relocation - general construction including modifications associated with relocation of steam exhaust as per plans filed herewith. no change in use, egress, or occupancy.
Nyu langone - steam exhaust relocation - structural modifications as per plans filed herewith. new opening for exhaust ductwork in cellar as per plans filing herewith. no change in use, egress, or occ...
Filing to modify HVAC ductwork at 26th floor office space as per plans. Existing equipment to remain. No change in use, egress, or occupancy under this application.
Filing for interior built out of a children daycare on first floor
Nyu langone - steam exhaust relocation - phase 1 mechanical modifications associated with the steam exhaust relocation as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work as per the plans filed herewith. no change to use, egress or occupancy.
Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
Legalization of installation of non-load bearing partitions and doors in apartments 2K, 2M, 3P, 4K, 7J, 9R, 10R, 17F, 17J, 18F and 19F [floors: 2 thru 4, 7, 9, 10, 17 thru 19]. No change in use, occup...
Filing herewith soft removal at existing 16th floor space. No change in use, egress or occupancy.
IRA to assist with Condition Assessment.
installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No change in use, egress, or occupancy
Deconstruction of existing interior non-structural wall cladding and non-load bearing partitions comprised of wood paneling and glazed ceramic block in select locations per plans. removal of existing...
At 9th floor south and 10th floor entire tenant space, structural additions/modifications and installation of convienence stair from 9 to 10fl in conjunction with tenant buildout gc work as per plans...
Plumbing work as per the plans filed herewith. no change to use, egress or occupancy.
IRA to assist with Condition Assessment.
Legalization of installation of non-load bearing partitions and doors in apartments 2K, 2M, 3P, 4K, 7J, 9R, 10R, 17F, 17J, 18F and 19F [floors: 2 thru 4, 7, 9, 10, 17 thru 19]. No change in use, occup...