Building Permits in ZIP 10016
Manhattan, NY — 1,066 permits filed recently
1,066 permits
Msb cellar - modifications to an existing sprinkler system as per plans filed herewith. no change in use, egress, or occupancy.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Herewith filing sprinkler modifications for NYU Langone HCC- Cath Lab Equipment HCC14 Project. No change in use, egress, or occupancy.
Interior alteration of existing commercial space on 2nd and 3rd floor, including architectural work.
Replace pl fixtures w/ new @ existing roughing (2 lav, 2 wc, 1 tub, 1 kitchen sink), relocate pl fixtures w/ new (1 dw), & install new pl fixtures @ existing roughing (1 shower). extend existing gas l...
Filing for selective Demolition/Construction and protection related to a Mechanical Equipment upgrade and Structural steel to support ducts to concrete slab.
Filing for selective Demolition/Construction and protection of Partial Cellar through 10th floor related to a Mechanical Equipment upgrade.
Tisch Hospital - Limited mechanical alterations to restroom and shower areas on the 7th, 16th, and 17th floors, including exhaust and air distribution modifications. No change to use, occupancy, or eg...
TO REMOVE EXISTING SPRINKLER SYSTEM TOTAL OF 91 SPRINKLER HEADS AND INSTALL NEW TEMPORARY SPRINKLER SYSTEM WITH 65 UPRIGHT SPRINKLER HEADS. AS PER DRAWINGS FILED HERE WITHIN. PROJECT IN CONJUCTION WIT...
Floor 1 : interior renovation of existing lobby. cellar: interior renovation of fitness, corridor & bathrooms. change in use. no egress or occupancy change.
Interior renovation of existing 1st floor docotr's office as per final co #101045833f including the removal & installation of non-load bearing partitions, new floor & wall finishes as per the drawing...
Installation of temporary shoring for the sub-cellar and cellar. no change in use, egress, or occupancy.
Mechanical work on partial 22nd floor as per plans. No change to use, egress or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
STRUCTURAL JOB SCOPE - Opening in existing floor concrete drape mesh for convenience stair and suspended LULA elevator pit.
Installation and use of mini crane for hoisting and installation of glass panels. no change in use, egress or occupancy.
Removal and installation of sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Removal and installation of sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Floor 1 : interior renovation of existing lobby. cellar: interior renovation of fitness, corridor & bathrooms. change in use. no egress or occupancy change.
Interior renovation of existing 1st floor docotr's office as per final co #101045833f including the removal & installation of non-load bearing partitions, new floor & wall finishes as per the drawing...