Building Permits in ZIP 10016
Manhattan, NY — 1,053 permits filed recently
1,053 permits
Filing for change of use from offices to three dwelling units, pram room to office and workshop to office as shown on drawings filed herewith. Additional work under M00730756, M01181181, M01179816, M0...
Install a temporary 10'-0 high construction fence as per drawings.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the sidewalk and driveway.
General construction for interior renovation of Apartment 7A on the 7th floor, as shown on drawings filed herewith. No change in use, egress, or occupancy.
Interior renovation of commercial space as per drawings. no change in use, egress or occupancy.
Install a temporary 10'-0 high construction fence as per drawings.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Removal of existing ductwork and installation of mechanical equipment and ductwork as shown on drawings filed herewith. Alt-CO filed under M01185872. OT, SP and PL work filed separately. No change in...
General construction for interior removals and installation of partitions, doors and finishes as shown on drawings filed herewith. PL, MS and SP filed separately. No change in use, egress or occupancy...
Interior renovation of 8th and 12 floor commercial spaces as per plans filed herewith.
Propose new illuminated signages for existing commercial space. no change to use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Replace existing HVAC units & system throughout building. Replace existing rooftop steel dunnage. Install finishes & milwork where distrubed to install new hvac units.
New dunnage on roof for HVAC units. Install new stairs on roof.
New dunnage on roof for HVAC units. Install new stairs on roof.
Replace existing HVAC units & system throughout building. Replace existing rooftop steel dunnage. Install finishes & milwork where distrubed to install new hvac units.
Structural framing work for the building's fuel oil tank vault room located underground of sidewalk at cellar level of building as per plans filed herewith. no change in use, egress or occupancy.
Equipment use, Temp Shoring and Chute for the demolition.
At 2nd floor tenant space, installation of interior partitions, finishes, ceiling, flooring, and interior convenience stair as per plans filed herewith. no change in use, occupancy or means of egress.
Facade repairs including terra cotta repair and replacement, brick repair and replacement, cut and repointing at deteriorated joints, and lintel replacement.