Building Permits in ZIP 10016
Manhattan, NY — 1,066 permits filed recently
1,066 permits
Installation and use of temporary debris chute as per plans filed herewith. no change in use, egress, or occupancy.
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
Alt co to convert office and showroom on the 11th floor from use group 5 to yeshiva university katz school of medicine and health in use group iii(b) as per the plans filed herewith. all work performe...
NYU KIMMEL - Garage Infill. Temporary Sprinkler Loop. No change in Egress, Occupancy or Use.
Alt co to convert office and showroom on the 11th floor from use group 5 to yeshiva university katz school of medicine and health in use group iii(b) as per the plans filed herewith. all work performe...
Installation and use of temporary debris chute as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of existing eating & drinking establishment. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the sidewalk and driveway.
alteration application for interior fit out. no change to use, egress nor occupancy
Interior renovation of tenant space as per drawings. no change in use, egress or occupancy.
Removal of existing ductwork and installation of mechanical equipment and ductwork as shown on drawings filed herewith. Alt-CO filed under M01185872. OT, SP and PL work filed separately. No change in...
General construction for interior removals and installation of partitions, doors and finishes as shown on drawings filed herewith. PL, MS and SP filed separately. No change in use, egress or occupancy...
INSTALLATION OF HEAVY DUTY SIDEWALK SHED (300psf & 600psf) AS SHOW ON PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation and use of temporary construction fence attached to existing sidewalk shed to enclose debris container and storage area as per plans filed herewith. no change to use, egress or occupancy.
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
General construction for interior renovation of Apartment 7A on the 7th floor, as shown on drawings filed herewith. No change in use, egress, or occupancy.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of commercial space as per drawings. no change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.