Building Permits in ZIP 10016
Manhattan, NY — 1,053 permits filed recently
1,053 permits
At 2nd and 3rd floor tenant space, structural modifications in conjunction with new stair opening and additional support for movable partitions as per plans filed herewith. no change in use, occupancy...
Filing to modify Sprinkler system at 26th floor office space as per plans. No change in use, egress, or occupancy under this application.
Alterations to mechanical system on 27th floor as per plans. No change to use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Install new AC units, ductwork related to new mechanical system on 11th floor as per plans. No change in use, egress or occupancy.
Limited facade repairs as per plans; no change to use, egress, or occupancy.
Installation of mechanical system in conjunction with alteration application # M01317557-I1.
Interior mechanical work in the restrooms on the 4th floor. No change in use, egress, or occupancy.
Heavy duty sidewalk shed during building conversion filed under application # m01223041, sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applicat...
Herewith filed for minor interior renovation to the existing corner retail store (#468 3rd avenue). plumbing application filed subsequently in dob now:build. no change to use, egress or occupancy.
Filing subsequent application for installation of AC unit, 5th floor office space, as per plans.
Filing sp for installation of sprinkler system for entire floor
Interior renovation of existing unit LB which includes remove and replace non- bearing partitions, minor carpentry and mill work and plumbing work filed as per plans. No change in use egress or occupa...
Interior renovation of existing unit LB which includes remove and replace non- bearing partitions, minor carpentry and mill work and plumbing work filed as per plans. No change in use egress or occupa...
Install new AC units, ductwork related to new mechanical system on 11th floor as per plans. No change in use, egress or occupancy.
Installation of mechanical system in conjunction with alteration application # M01317557-I1.
Filing sp for installation of sprinkler system for entire floor
Filing subsequent application for installation of AC unit, 5th floor office space, as per plans.
Interior mechanical work in the restrooms on the 4th floor. No change in use, egress, or occupancy.