Building Permits in ZIP 10016
Manhattan, NY — 1,053 permits filed recently
1,053 permits
Plumbing work in conjunction with a restaurant fit out.
Remove wall and floor finisheds and install new wall and floor finishes, replace concierge desk , in Lobby. No change to use egress or occupancy.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Interior renovation of existing eating and drinking establishment on cellar, first floor and mezzanine in conjunction with alt1 application# 101430836. No change in use, egress or certificate of occup...
Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Minor interior renovation to the first floor commercial store, including the installation of a new mechanical hood, ducts, and precipitator as per plan. no change in use, egress, or occupancy.
General Construction to install a non-load bearing partition at apartment #11D on the 11th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Sprinkler filing in conjunction with ALT 2 filing # M01275925-I1
Sprinkler work as shown on plans filed herewith.
Propose to perform demo work. No change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior demo of partitions on 15th floor as per plans. No change in use, egress or occupancy.
Temporary system scaffold stair tower as per drawings. system scaffold stair tower shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 4th floor (corridor bathroom and freight lobby as per plans filed herewith. no change in...
General Construction to install a non-load bearing partition at apartment #11D on the 11th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Mechanical work in 31st floor as per plans. No change to use, egress or occupancy.
Temporary system scaffold stair tower as per drawings. system scaffold stair tower shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 4th floor (corridor bathroom and freight lobby as per plans filed herewith. no change in...
Minor interior renovation to the first floor commercial store, including the installation of a new mechanical hood, ducts, and precipitator as per plan. no change in use, egress, or occupancy.