Building Permits in ZIP 10016
Manhattan, NY — 1,053 permits filed recently
1,053 permits
Interior renovation at 001 floor store with general construction work as per plan filed herewith. no change of use, egress or certificate of occupancy.
Installation and use of temporary suspended scaffold for facade repairs as per plans filed herewith. no change to use, egress or occupancy under this application.
Additions/Modification to the existing HVAC system on the 18th Floor-Suite-1801 ( Viabizzuno Ste) as per plan. No change to use, egress or occupancy
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress under this applicat...
Installation of 7.92 kw solar energy system on roof. No change of occupancy, use or egress.
Structural work in connection with the interior renovation of existing commercial space. no change in use, occupancy or egress.
NYU Langone Health - Kimmel Pavilion Retail pharmacy workroom- Interior modifications on partial first floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Structural reinforcement of existing fire stairs, masonry repairs.
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress under this applicat...
NYU Langone - Kimmel Pavilion - Retail Pharmacy workroom - mechanical modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy or use.
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
Structural work in connection with the interior renovation of existing commercial space. no change in use, occupancy or egress.
Additions/Modification to the existing HVAC system on the 18th Floor-Suite-1801 ( Viabizzuno Ste) as per plan. No change to use, egress or occupancy
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
NYU Langone Health - Kimmel Pavilion Retail pharmacy workroom- Interior modifications on partial first floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Structural reinforcement of existing fire stairs, masonry repairs.
Installation of 7.92 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress under this applicat...
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress under this applicat...
HUB consultation meeting held 6/6/25. Herewith filing for parking garage removal for Emergency Dept expansion as per plans.