Building Permits in ZIP 10003
Manhattan, NY — 1,064 permits filed recently
1,064 permits
(PHASE I) interior Demo/ renovation of existing 4 stories, plus cellar structure. Architectural/ construction work only.
temporary Construction / mock-up to show the proposed roof and rear yard change for landmarks approval. No new proposed construction architectural / Temporary construction work only. .
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
General construction for temporary space for Xantium Investments on 12th floor
Proposed conversion on a twelve (12) story comunity facility building to a thisteen (13) story mixed-use residential building. lots 11 and 15 to be merged as a single zoning lot. lot # 15 filed under...
Interior renovations to convert doctors office into 2 apartments as per plans filed herewith
Mechanical work as per plans filed herewith
Installation and modification of plumbing fixtures as per plans.
Interior renovation in 20h filed in conjunction with dob now pl. no change to use, occupancy or egress.
Filing herewith plumbing modifications as per plans.
Interior renovations to convert doctors office into 2 apartments as per plans filed herewith
General construction for temporary space for Xantium Investments on 12th floor
Interior renovation in 20h filed in conjunction with dob now pl. no change to use, occupancy or egress.
Mechanical work as per plans filed herewith
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Minor modifications to natural gas piping to bring boiler room up to code.
Install new gas service, gas meter, & associated piping. install (1) new hot water heater & (2) new storage tanks. no change in means of egress, use group, or occupancy.
Filing herewith mechanical modifications as per plans
Hereby filing for interior renovation and combination of two existing apartments 12a & 12b as per tppn 3/97 as per drawings submitted. this app do not require a new or amended certificate of occupancy...
Structural work as shown on plans filed herewith. No change in use, egress, or occupancy.