HVAC Permits in Staten Island, New York
146 hvac permits filed recently
146 permits
Ps 004r, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 50...
Laundromat demolition. work includes remove exist'g washers, exist'g dryers, exist'g h.w. boiler w/ tanks, exist'g sprinkler heads.
2A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
1A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
Registering one electric hot water heater, one warm air furnace, one gas residential gas stove and gas piping as per plans filed herewith.
Remove incinerator and cap existing flue. Install new flue lining in chimney. Remove existing thermostats throughout building and replace with new. Remove and replace ductwork, oil piping, vent piping...
Oil to gas conversion, install new boiler and indirect hw tank with reconnection to existing distribution in cellar.
R041, installation of temporary chimney, steam and condensate pipings and connect temporary emergency mobile boiler trailer to provide heat during heating season. no change in use, egress or occupancy...
Installation of New Split Multi Zone HVAC System.
Oil to gas conversion, install new boiler and indirect hw tank with reconnection to existing distribution in cellar.
2A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
Installation of New Split Multi Zone HVAC System.
Registering one electric hot water heater, one warm air furnace, one gas residential gas stove and gas piping as per plans filed herewith.
1A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
R041, installation of temporary chimney, steam and condensate pipings and connect temporary emergency mobile boiler trailer to provide heat during heating season. no change in use, egress or occupancy...
Filing for the direct replacement of the existing HVAC, condenser, and air handler inkind. No change in use, egress,s or occupancy.
Filing for the direct replacement of the existing HVAC, condenser, and air handler inkind. No change in use, egress,s or occupancy.
Hvac filing for 2-family residential house
Hvac filing for 2-family residential house
Hvac filing for 2-family residential house