Other Permits in Queens, New York
4,394 other permits filed recently
4,394 permits
Installation of 8ft high Plywood construction fence as per approved plans
File soe in conjunction with job#q01269204
File suspended scaffold outrigger systems for facade restoration and inspection.
Install approx. 1,780 lf of supported scaffold at a max height of 105ft around ps42(q0 school building and rear courtyards
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
application filed to enlarge at rear, exterior & interior walls; to remain 1 family
Horizontal and vertical enlargement of existing 2 story building as per plan
Filing for the installation of sidewalk shed on behalf of contractor
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Replacement of the damaged bricks and shelf angles
Filing for the installation of sidewalk shed on behalf of contractor
Propose new 4-story plus cellar and penthouse multi-family residential building as per plan. obtain new c of o.
Interior modifications on construction floor 48 (marketing floor 50) as per plans filed herewith. No change to use, egress, or occupancy.
Temp constr. fence; 8' high at lot lines
Install 8'-0 height construction fence as per plan. no change to use, occupancy or egress.
New 5' high (from top of footing) concrete retaining wall at rear parking lot
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Interior partial demo plan for the existing one family house. no change in use, egress or occupancy,
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cas...