Other Permits in Queens, New York
4,394 other permits filed recently
4,394 permits
Install footings and foundation walls
Installation of 5000 lbs gjj sc270gd single car personal hoists and employee elevator as per plan in conjunction with q00710146-i1. work shall comply with 2022 nyc building code. no change to egress,...
General construction modifications taking place on the 1st fl as per plans filed herewith. No change in use, egress or occupancy
Tenant fit-out for existing eating and drinking establishment at 001 floor, unit 110 & 111 with general construction work; no change of use, egress or certificate of occupancy.
Propose new 16-story residential building with 52 dwelling units. obtain new c of o.
Application herewith file for exterior ada ramps and window at front facade and minor partition work at first floor. no change to occupancy, use, egress, or bulk.
New concrete pad on grade to support new vertical tanks. new doorway opening in fabricated steel building. no change to use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Install Temporary Wood Construction fence.
PS216Q-EXISTING BUILDING STRUCTURAL- WORK .The scope of work consists of the removal of an existing concrete column as well as the supplementary framing required to accomplish this scope at each floor...
Sprinkler and standpipe work related to the construction of a new 12 story affordable housing building as per plans filed herewith.
Sprinkler and standpipe work related to the construction of a new 12 story affordable housing building as per plans filed herewith.
Temporary fence in conjunction with TPA # Q00920211
Installation of pipe scaffold at existing building 64-20 175 street, queens as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
installation of 8' Construction fence
Proposed new two story two family dwelling building. obtain certificate of occupancy.
The scope of the work includes the installation of the supplemental cooling systems for the girls gymnasium.
Propose a new 2-story 2- family building.
Application file to remove canopy approx 15ft long x 4ft wide & suspended approx 12ft above sidewalk by two 20 metal pipes and attached to the drick of the building on ther other end. no change in use...
Propose two story with two family house. obtain new c of o.