Other Permits in Manhattan, New York
11,312 other permits filed recently
11,312 permits
Addition of elevator & dumbwaiter shafts foundation . New foundation for support of existing concrete slab using new CMU walls at cellar. Addition of footing for handicap lift at the east entrance (sc...
Installation of suspended scaffold for facade work or inspection. amend #8, added scaffold drops
Masonry facade work as per plans to address conditions cited in the DOB and OATH Violations and the Cycle 9 FISP report. No change to use , egress, or occupancy.
Installation of the temporary plywood fence at 108 west 139 street, manhattan, ny 10030 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 nyc building code . no change in use, occupancy, or egress under this ap...
The support of excavation (soe) for the construction of a new elevator in the existing cellar, including safe sloping and timber shoring. no change to use, egress or occupancy.
Filing for a construction fence to safeguard the property during construction & installation of temporary pipe scaffold as per plans. no change in use, egress, or occupancy.
Modification of sprinkler system as shown on plans
MSM SP S Block - SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Mechanical system work as per the plans filed herewith. no change to use, egress or occupancy.
Installation of new temporary sidewalk shed as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Sprinkler modifications taking place on 37th floor construction (38th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Filing herewith for installation of Makeup Air Unit and related ductwork
Mechanical work: filing for the installation of split system for a/c and ventilation in apt. 3 on third floor.
Replacement of existing louver on the 81st floor in an existing window frame. No change to egress use or occupancy
Installation of ventless kitchen hood for existing store. no exhaust suct and fan.
Mechanical modifications to 18th floor. No change in use, egress or occupancy. (Filing in conjunction with Arch filing: M01150313)
REMOVE PARTITIONS & FINISHES, INSTALL NEW PARTITIONS & FINISHES. NEW DROPPED DRYWALL CEILINGS WITH POST-INSTALLED ANCHOR SYSTEMS. KITCHEN RELOCATED TO WET BAR LOCATION. LAUNDRY ROOM TO BE MOVED TO KIT...
Modifications to sprinkler system on 6th floor as per plans filed herewith.
Filing herewith for installation of Exhaust Fan and Precipitator serving Kitchen on 1st floor (STK Grace)