Modify existing sprinkler heads in coordination with the new reflected ceiling plans.
Provide new 4 floor control valve assemblies connected to existing 8 standpipe on 7 floors with distribution and new sprinkler heads.
Installation of temorary plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under...
SP work to alter an existing system on floors 2-5, 7 and 8.
Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this...
Mechanical work including installation of ac units, exhaust fans, kitchen hoods, and makeup air units with ductwork.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of knee bracket as per plans. no change in use occupancy or egress under this application.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Converting existing building from 4 apartments and furnished room into 2 family dwelling units within the same envelope as perplans submitted. the application is also filed to cure the violations #390...
backyard Patio restoration including replace membrane and replace travertine tiles with marble tiles as per plans filed herewith. No change to use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Replace existing thru-wall ac unit in Apt 6C. No change to use, egress, or occupancy.
The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bearing party wall separating building no. 663 from 655 fifth a...
Removal of existing sprinkler head and installation of temp loop as per plans filed herewith. No change in use, egress or occupancy under this application .
Structural modifications as shown on filed plans
Reach 7-new flood wall constr. for nwbpcr proj. scope involves excavation, grading, landscaping soil improvement. adding & compacting fill to stabilize site w/ erosion cont. stabilizing foundation of...