Other Permits in Manhattan, New York
11,314 other permits filed recently
11,314 permits
Construction work on the 10th floor (Ramboll) as indicated on drawings.
Install of temp platform, LED screen, scenic walls, no alt to exist structures for Paramount Upfront. A TPA is required. Producer is responsible to monitor site safety. All production equipment remove...
Replacement of existing exterior doors with same in same location as per plans filed herewith. No change in egress, use or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Corridor and bathroom modifications
Installation of temp Frame Arches.no alt to exist structures for VCA Blooms 2025. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment re...
Overhead protection for occupants at courtyard.
Sprinkler work on the 10th floor (Ramboll) as indicated on drawings.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Conversion of bldg (portions thereof) pursuant to Article I-Chapter 5(ZR), change of non-residential floor area to residences of any type proposed mixed use 2 family dwelling with non-residential use...
Minor partition work in apt 1 with general Carpentry . No change to use bulk or egress
Interior demo of 19,20 & 21 floor interconnecting staircase approximately 750 square feet as per plans. No change in use, egress or occupancy.
Modification to exisiting sprinkler system,no change to use, egress, or occupancy.
Herewith filing for removal of interior non load bearing partitions and doors as per plans. no change to use, egress or occupancy under this application.
Install and register one ac for the 1st floor restaurant. no change in use, egress or occupancy.
Mechanical work on the 10th floor (Ramboll) as indicated on drawings.
Sprinkler modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Shoring of Underground Utilities