Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Removal of sprinkler heads and installation of temporary sprinkler loop on the 1st floor as indicated on drawings.
Minor partition and lighting work in suite 301. No change to use, egress or occupancy.
Filing for 30th floor interior demo as per plans submitted herewith.
Temporary structures for The Shed cultural and event programing. Removed at the end of the programing. No changes to existing structures, use or egress
Soe/is293m - for support of excavation submitting on behalf of contractor, related dob number # m01020891,m01133344 no change in use,occupancy or egress
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, egress or occupancy. sidewalk shed shall comply with chapter 33 of nycc
Hereby filing to construct interior partitions, ceilings and doors for for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Hereby filing to construct interior partitions, ceilings and doors for for lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of new non-load bearing partition and door. No change in use, egress or occupancy. (Executive Office Security Upgrades).
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Mechanical work as per plans.
Modifications to an existing Sprinkler System on the 2nd floor
General Construction taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
General construction modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Temporary platform for a film shoot. Removed at the end of the programing. No changes to existing structures, use or egress.