Other Permits in Manhattan, New York
11,365 other permits filed recently
11,365 permits
Installation of temporary p/m hoist complex as per plans in conjunction with general construction work. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc buildin...
Soe/is293m - for support of excavation submitting on behalf of contractor, related dob number # m01023321 ,m01133344 no change in use,occupancy or egress
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of suspended scaffold for facade work or inspection.
Structural modifications as per plans filed herewith new steel beams, new steel dunnage beams as per plans herewith. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Remove existing metal and concrete equipment curbs. Provide new structural steel dunnage and curbs for new equipment and reinforce existing structural steel floor beams.
Temporary Installations to be used on a temporary event Automotive Press Reveal. All the Installations are to be removed upon completion of the event.
Sprinkler modifications as per plans. no change in use, egress or occupancy.
Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Removal and instillation of interior non load bearing partitions and related finishes of existing business offices. No change in use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping as part of lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.
New stair opening at 17th Floor and new convenience stair between 16th & 17th Floors as shown on drawings. No change in use, egress or occupancy.
Remove wall and floor finisheds and install new wall and floor finishes, replace concierge desk , in Lobby. No change to use egress or occupancy.
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.