Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Chute Installation
Reach 7- proposed flood barrier sys. includes i-walls w/ cap/wall, micropile-founded t-/l-walls, closure gates (roller @ 2nd pl, swing @ 3rd, flip-up @ sea), slide-up gates, gravity wall & stair to so...
Partition, finish, fixture work in part of existing duplex dwelling unit. No change to use, egress or occupancy under this application.
Propose masonry window openings on 6th fl on east facade and 12th floor on east facade at the corner condition.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of a medium duty pipe scaffold as per plans in conjunction with general construction work. no change in use, egress or occupancy. pipe scaffold shall comply with 2022 nyc building code,ch...
Filing fence application as per plans. no change to use, occupancy or egress on this application.
Facade Inspection via Industrial Rope Access
Mechanical modifications to take place on the 20th floor as per plans filed herewith. No Change in use, egress, or occupancy.
Install a ventilation system with make up air, etc. No change of use, egress or occupancy.
Install new sprinkler heads and related piping on 1st floor for new eating & drinking establishment. no change to use, egress or occupancy.
L-4 CARDIOLOGY Phase 4: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE...
Installation of Heavy-Duty Sidewalk Shed. No change in use, occupancy, or egress.