Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Demolition of the existing interior build out and core toilets as shown on drawings. No change in use, egress or occupancy.
Interior renovation to apartment unit 3c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and faade
5th floor- modification to existing sprinkler system, demolition of branch pipiing and sprinkler heads. installation of tcsp as per plans filed.
Propose interior partition and finish demolition work at the cellar and 1st floor commercial space as per plan. No change in use egress, or occupancy.
Partial demolition means & methods for portions of 2nd floor, mezzanine, 1st floor, escalator removal as per plans. this application is filed in conjunction with m01277980-s5.
Interior renovation on apartment 4e on 4th floor including non-structural demolition and installation of interior walls and finishes as indicated on plans filed herewith. no change of use, egress or o...
Interior demolition of non load bearing partitions on the 21st floor (SW corner, former EyeBio) as indicated on drawings
Interior renovations to existing apt. #11G. Work to include non-structural demolition, general construction and finishes, as per plans filed herewith. No change in use, egress or occupancy.
Interior alteration related to the combination of two existing apartments #ph19 and #ph20-21, including demolition & general construction work. No change to use, occupancy or egress
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel be...
Demolition of the existing interior build out and core toilets as shown on drawings. No change in use, egress or occupancy.
Interior demolition of existing non-bearing gyp. bd. partitions. Installation of new non-bearing partitions, door, frames and finishes. No change in use, occupancy or egress
5th floor- modification to existing sprinkler system, demolition of branch pipiing and sprinkler heads. installation of tcsp as per plans filed.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 12th floor as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Interior non-structural demolition of 1st and 2nd floors, including removal of non-load bearing partitions, finishes, doors, storefront elements at eating and drinking establishment, as per the archit...
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Full demolition to a one story building
Interior demolition of existing mechanical systems as shown on filed plans.
Interior demolition of non load bearing partitions on the 21st floor (southside-former Lock8) as indicated on drawings.