Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Interior renovation to apartment unit 2d, 6c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and fa...
interior demolition on 13th and 14th floor as per plans filed herewith. No change in use, egress or occupancy,
Use of mechanical demolition equipment during partial demolition, filed separately under M01299104-S3.
Interior demolition as per plans filed. no change to use egress nor occupancy.
Demolition Sequence & Bracing and Shoring
Mechanical demolition on the 17th floor as indicated on drawings.
INTERIOR NON-STRUCTURAL DEMOLITION OF EXISTING OFFICE TENANT FIT-OUT Including REMOVAL OF EXISTING NON-LOAD-BEARING PARTITIONS, CEILINGS, FINISHES, AND PARTIAL DEMO OF CORE RESTROOMS as shown on plans...
Herewith filing partial demolition work/sequence, as per plans submitted. Work is filed in conjunction with ALT 1 #: 121330327 and M08008884.
Interior demolition of the existing non-bearing walls and partitions in the existing 1st floor commercial space.
Perform interior partition, hung ceiling demolition & construction in conjunction with apartment renovation #6a. replace existing ptac units in same location and convector covers. all as per plans. no...
Debris chute and mechanical equipment use in conjunction with partial interior non-structural demolition: skid steer loader, track loader, mini loader, demo robots, and mini excavators as per plans.
General construction filed for demolition of interior non-bearing partitions and finishes, as shown on plans filed herewith. No change in use, egress, or occupancy.
Structural demolition as per plans filed herewith.
Minor demolition with installation of new partitions on the 34th floor as per plans. No change to Use, Egress or Occupancy.
Full demolition of foundation.
Minor interior renovation to apartment unit 24. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and...
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (6 & 7 Floors- Tenant Name) as per plans. No change to use, egress or occupancy.
full demolition of four story structure, using hand held and mechanical means to assist from exterior.
5TH FLOOR DEMO-- PRE-TENANT INTERIOR NON-STRUCTURAL DEMOLITION INCLUSIVE OF PARTITIONS REMOVALS AS PER PLANS FILED. No change to use, egress, or occupancy.
interior demolition and construction for white box on 9th floor