Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Demolition of non-load bearing paritions, intallation of new partitions, doors and finishes on the first (1st) floor, apt. 1ds as per plans. no change to use, egress or occupancy.
Removal of partitions, plaster, and framing. No structural demolition & no structural partitions to be removed. Wood floors removed to the subfloors & joists to remain in place. All associated work ty...
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.
Interior 1st floor renovation with selective demolition, new non-load-bearing partitions, new door installation, ceiling adjustments, and finish work as per the architect's plans. there is no change t...
Preparation Work for Full Demolition - Removal of Glass Windows
Interior demolition including removal of all non-structural interior partitions, furring and finishes.
Construction build out of existing restaurant on 1st floor which is a white box, renovation includes demolition of existing non loading bearing partitions. a new restroom to be added as are new non-lo...
Selective interior demolition and construction work on the 9th floor. No change in use, egress, or occupancy.
Interior demolition as per plans filed herewith. No change to use, egress or occupancy.
Filing herewith sprinkler demolition as per plans
Combination of tax lots & two existing single-family residential townhouses. Exterior masonry, enlarged window masonry openings, interior masonry demolition to connect the existing townhouses, interio...
Interior demolition including removal of all non-structural interior partitions, furring and finishes.
Preparation Work for Full Demolition - Removal of Glass Windows
Filing herewith sprinkler demolition as per plans
Preparation Work for Full Demolition - Demolition of West Facade for Abatement Access
Combination of tax lots & two existing single-family residential townhouses. Exterior masonry, enlarged window masonry openings, interior masonry demolition to connect the existing townhouses, interio...
Construction build out of existing restaurant on 1st floor which is a white box, renovation includes demolition of existing non loading bearing partitions. a new restroom to be added as are new non-lo...
Selective interior demolition and construction work on the 9th floor. No change in use, egress, or occupancy.
Interior demolition as per plans filed herewith. No change to use, egress or occupancy.
Interior Demolition interior partitions, doors, ceilings and flooring.