Demolition Permits in Manhattan, New York
923 demolition permits filed recently
923 permits
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 47th Floor, as per plans. No change to use, egress, or occupanc...
This alteration is being filed for interior demolition of the existing cellar, 1st & 2nd floors. Work includes demo of non structural partitions & doors.
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 45th Floor, as per plans. No change to use, egress, or occupanc...
Interior build-out of apartment #3. Work to include non-structural demolition, general construction, and finishes, as per plans filed herewith.
Perform minor interior partition demolition & construction inconjunction with apt#3j renovation. remodel kitchen, create pantry area & upgrade bathroom. create new masonry opening for kitchen hood exh...
Interior alteration to existing apt. 6b on the 6th floor. general construction work, demolish and construct non-structural interior partitions, doors, finishes. renovate ex. bathrooms and kitchen. no...
Minor demolition and installation of partitions, doors, ceilings and finishes on the 2nd floor(Elevator lobby & Corridor) as per plans. No change to use, egress or occupancy.
Filing herewith interior demolition in cellar unit 1B bathroom as per plans filed herewith. No change to use, egress or occupancy.
Mechanical Equipment Use for Interior Demolition
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 46th Floor, as per plans. No change to use, egress, or occupanc...
test
Interior renovation within the limits of apt 36-d only. no demolition of structural elements. no change of use, egress or occupancy.
FILING FOR DEMOLITION OF METAL STAIR FROM 35th TO 39th FLOOR, INFILL OF EXISTING SLAB OPENING ON 36th THROUGH 39th FLOORS WITH NEW SLAB CONSTRUCTION AS PER PLANS SUBMITTED HEREWITH.
Interior demolition of non-structural partitions for an existing commercial space. No change of use, occupancy or egress
Demolition of existing mechanical equipment associated controls, ductwork and piping
Demolition of existing mechanical equipment, ductwork and piping serving the area of work indicated on drawing plans. No change to use, egress, or occupancy.
Demolition of existing mechanical equipment associated controls, ductwork and piping
Demolition of existing mechanical equipment, ductwork and piping serving the area of work indicated on drawing plans. No change to use, egress, or occupancy.
Interior demolition of non-structural partitions for an existing commercial space. No change of use, occupancy or egress
Full demolition to a one story building