Demolition Permits in Manhattan, New York
922 demolition permits filed recently
922 permits
Interior mechanical demolition on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated on drawings.
Non-structural interior demolition at existing 10th floor office space. remove existing floor finishes and non-load-bearing partitions. no change in use, egress, or occupancy.
Application filed to renovate apartment 29 on the 12th floor; interior renovations to include limited demolition of non-bearing partitions and finishes as per plans
Use of mechanical demolition equipment during interior demo, filed separately under m01296642-i1.
Interior renovation of daycare at 1st floor and preschool at cellar. demolition and installation of non-loadbearing partitions, replacement of storefront in existing openings, new finishes and lightin...
Interior renovation to include demolition of existing and construction of new partitions in suite 500 for existing office space. no change in use, egress, or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st & 2nd floors (Harry Winston Retail) as per plans. No change to use, egress or occupancy.
Renovation of an existing apartment# 11W on the 11th floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
full demolition of 6 story structure by hand and mechanical means to assist from exterior on grade.
Interior alterations to 4th floor commercial space to include non-load bearing demolition. no change to use, occupancy or egress
Demolition of existing ductwork, HW piping, FTR, Fans, Heat exchangers and pumps serving CU Hartley Hall as per plans filed herewith. No change of use, occupancy or egress.
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 15th through 19th floors. No change to egress, use or occupancy.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 2nd through 8th floor. No change to egress, use or occupancy.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 9th through 14th floors. No change to egress, use or occupancy.
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
full demolition of 6 story structure by hand and mechanical means to assist from exterior on grade.
Demolition of existing ductwork, HW piping, FTR, Fans, Heat exchangers and pumps serving CU Hartley Hall as per plans filed herewith. No change of use, occupancy or egress.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 9th through 14th floors. No change to egress, use or occupancy.