Demolition Permits in Manhattan, New York
922 demolition permits filed recently
922 permits
Interior renovation to apartment unit 2d, 6c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and fa...
Engineered Enclosure System for Full Building Demolition
mechanical equipment to assist with demolition and chute will be built to lower debris
Scope of work will include the interior demolition at the first floor to address ecb violation #34650205j. no change in use, occupancy or egress.
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per approved plans. No change...
Minor interior renovation to apartment unit 24. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and...
Interior apartment combination of the existing apartment #1f on the basement floor with #2 on the basement and 1st floor w/ the recreational space as accessory use only including partition demolition...
Engineered Enclosure System for Full Building Demolition
Interior renovation to apartment unit 2d, 6c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and fa...
Scope of work will include the interior demolition at the first floor to address ecb violation #34650205j. no change in use, occupancy or egress.
Interior renovation to apartment unit 3c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and faade
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per approved plans. No change...
Interior apartment combination of the existing apartment #1f on the basement floor with #2 on the basement and 1st floor w/ the recreational space as accessory use only including partition demolition...
mechanical equipment to assist with demolition and chute will be built to lower debris
Minor interior renovation to apartment unit 24. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and...
Minor interior renovation to apartment unit 1d,3c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows a...
Renovation of an existing dwelling unit. Architectural work as per plans. Partial demolition for a new facade penetration. No change of use, occupancy or egress.
Interior renovation to existing office space. includes theinstallation and selective demolition of non load bearingpartitions and related finishes. no change in use oroccupancy.
Filing herewith interior demolition and renovation on the 20th FL. as per plans filed herewith. No change to use, egress or occupancy.
Interior renovation of existing single-family residence, work to include demolition and installation of new finishes, millwork, lighting, new primary bedroom partition configuration as shown on plans.