Demolition Permits in Manhattan, New York
923 demolition permits filed recently
923 permits
General construction and partial demolition of the Rockefeller Research Lab (Pavilion Enabling) parking garage as per plans filed herewith. No change in use or occupancy under this application. Existi...
Demolition and general construction on retail on 1st and 2nd floors as per plans. No change to use, egress or occupancy.
Demolition and general construction work on partial 25th floor as per plans. No change to use. egress or occupancy.
Structural modifications associated with Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration. Scope to include, but not limited to, partial demolition, reinforced concrete, structur...
Interior demolition of an existing commercial space. no change in use and occupancy; no change in egress.
The scope of work is limited to the selective demolition of existing interior non-bearing partitions and associated finishes. no building systems areproposed to be modified or altered as part of this...
Minor demolition with installation of new partitions on the cellar and 1st floors as per plans. No change to Use, Egress or Occupancy.
Full Demolition of a 4 1/2-Story Residential Building
Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
Removal of non-load bearing interior partitions and all mechanical equipment in association with full building demoltion, by others. there is no change to use, egress, occupancy, or fire protection.
Demolition of all existing equipment, duct work and risers
Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
Removal of non-load bearing interior partitions and all mechanical equipment in association with full building demoltion, by others. there is no change to use, egress, occupancy, or fire protection.
The scope of work is limited to the selective demolition of existing interior non-bearing partitions and associated finishes. no building systems areproposed to be modified or altered as part of this...
full demolition of 3 story structure
Demolition of all existing equipment, duct work and risers
Full Demolition of a 4 1/2-Story Residential Building
Interior demolition of an existing commercial space. no change in use and occupancy; no change in egress.
Minor demolition with installation of new partitions on the cellar and 1st floors as per plans. No change to Use, Egress or Occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.