Demolition Permits in Manhattan, New York
922 demolition permits filed recently
922 permits
mechanical means will be used to assist with exterior demolition. Chute will be built up to load out debris from floor to floor
Demolition and general construction work on 27th floor as per plans. No change to use, egress or occupancy.
Modify existing sprinkler system to accommodate the renovated space. This include demolitions, relocation and new devi e installations. All modifications shall be performed in accordance with NYC BC,...
Selective removal of the existing facade on pine st and wall st, g-l05. removal of interior finishes on floors g-l1. no interior demolition on floors l2-l5. no change in use, egress, or occupancy
mechanical equipment will be used to assist with demolition from exterior, and chute will be built up to lower debris from floor to floor
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th floor (CCRB), as per plans. No change to use, egress or occupancy.
Interior renovation of apartment 22fg on 21st floor including non-structural demolition and instllation of new interior partitions and finishes as indicated on plans filed herewith. no change of use,...
Minor interior renovations to existing Class A apartment 10HW on the 9th floor of an existing mixed-use building. Scope includes selective demolition of non-load-bearing walls, installation of non-loa...
Selective removal of the existing facade on pine st and wall st, g-l05. removal of interior finishes on floors g-l1. no interior demolition on floors l2-l5. no change in use, egress, or occupancy
Modify existing sprinkler system to accommodate the renovated space. This include demolitions, relocation and new devi e installations. All modifications shall be performed in accordance with NYC BC,...
Demolition and general construction work on 27th floor as per plans. No change to use, egress or occupancy.
mechanical means will be used to assist with exterior demolition. Chute will be built up to load out debris from floor to floor
Full demolition to a four story building
Minor demolition with installation of new partitions on the 28th floor as per plans. No change to Use, Egress or Occupancy.
Renovation of an existing apartment# 35B on 35th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
Proposed: demolition and removal of all interior fit out down to sub-surfaces for apartment PHB ( 14th -16th floors). No enlargement proposed and party walls and fire walls to remain in their entirety...
Mechanical Equipment application filed subsequent to Demolition Application; job number: M01205930-I1.
Proposed to cut, cap and demolish sprinkler system floor by floor in conjunction with full demo job # m01232460. no change to use, egress or occupancy under this application.
mechanical means to assist with full demolition
Minor demolition and erection of interior non-load bearing parition to install washer dryer and replacement of kitchen cabinets and counter apt 3un. all as per plans and applications. no change to use...