Demolition Permits in Manhattan, New York
923 demolition permits filed recently
923 permits
Minor interior demolition and alteration works for 14th floor office space. no change to use, egress or occupancy.
Interior demolition of non-loading partitions on the 3rd floor office space as per plans filed herewith. no change in use, egress, or occupancy.
Herewith filing for interior demolition of existing mechanical systems in subcellar #1 as per plans. no change to use occupancy or egress.
8'-0 high construction fence to be erected along the perimeter of structure to undergo demolition and construction operations.
Combination of two residential units including demolition and reconfiguration. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes.
General Construction demolition work taking place on floors 001-003 as per plans filed herewith. No change in Use, Egress or Occupancy.
Full demolition to a four story building
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Legalization of demolition work completed under emergency work order Control No. 337386, Violation Number FEU10601FF
Herewith filing for demolition of the subcellar #1 as per plans. no change to use, occupancy, or egress under this application.
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Application filed for legalization of general construction and interior demolition on the 8th floor. No change in use, egress, or occupancy.
Interior renovation in apartment #17 on 5th floor of existing 5 story building. demolition work and construction work as per plan. repairing partition, flooring, ceiling and painting throughout, no ch...
Legalization of demolition work completed under emergency work order Control No. 337386, Violation Number FEU10601FF
Application filed for legalization of general construction and interior demolition on the 8th floor. No change in use, egress, or occupancy.
Full demolition to a four story building
Herewith filing for demolition of the subcellar #1 as per plans. no change to use, occupancy, or egress under this application.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings