Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Interior demolition and installation of new partitions and finishes on partial 6th floor in the existing office building as per plans filed herewith only. No change to zoning, use, egress, or occupanc...
Interior demolition of non load bearing partitions on the 15th floor (NE corner) as indicated on drawings.
Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor as per plans (Hines - Demo & Whitebox.) No change to use, egress or o...
Structural application filed for partial demolition and shoring work to remedy dangerous conditions due to partial collapse. No change to use, egress or occupancy.
Interior demolition of non load bearing partitions on the 10th floor (part of northside suite) as indicated on drawings.
full demolition of 22 story structure using hand held and mechanical equipment to assist.
Limited interior demolition of finishes and interior partitions. no change in use, egress, or occupancy.
Interior demolition and installation of new partitions and finishes on partial 6th floor in the existing office building as per plans filed herewith only. No change to zoning, use, egress, or occupanc...
Structural application filed for partial demolition and shoring work to remedy dangerous conditions due to partial collapse. No change to use, egress or occupancy.
interior demolition of non-bearing partitions in the existing doctors' office.
Interior demolition of non load bearing partitions on the 10th floor (part of northside suite) as indicated on drawings.
Interior renovation to existing apt. 11N. Work to include non-structural demolition, general construction, and related finishes. No change in use, egress, or occupancy.
Limited interior demolition of finishes and interior partitions. no change in use, egress, or occupancy.
Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor as per plans (Hines - Demo & Whitebox.) No change to use, egress or o...
Interior demolition of non load bearing partitions on the 15th floor (NE corner) as indicated on drawings.
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
Filing application for minor non-structural demolition and construction in cellar portion of duplex commercial unit. All work as per plans filed herewith. No change in use, egress or occupancy.
Structural demolition/modifications on Floor 2 and associated shoring on Floors 1 and 2. No change in egress, use or occupancy
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Application is filed for interior demolition andrenovation in cellar that doesn't affect use, egress oroccupancy of the space, and therefore, no new or amendedcertificate of occupancy is required