Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.1 KW
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
Proposed plumbing work on open space, cellar, 1st to 4th floor,penthouse, roof in conjunction with dob alteration co job #: b01001057-i1. no change in use, bulk, egress or occupancy.
install solar modules and rooftop racking system on 5TH Floor Roof of existing building
Structural work in the cellar, 1st thru 3rd floor and roof as plans filed herewith. filed in conjunction with alt co # b01278488-i1.
Restoration facade repairs, partial roof replacement of hexagonal setback roof , parapet repairs, repoint dome TC joints.
Work proposed to show repairs on floors 002-004 due to fire fighting operations: skylight replacement, repair of hole in the roof and minor related renovation as per plans filed herewith . no change i...
Subsequent filing for ms work type in conjunction with application# b01341089-i1. install hvac units, kitchen exhaust hood & system up to roof for a little caesar pizzer on 1st floor. no change in use...
Filing for the installation of construction fence (to perform overhead and waterproofing work) on behalf of contractor.
Replacement of 2 condeisng units on the roof with a total capacity of 4.5 tons. no change to egress, use, or occupancy.
Filing for the installation of construction fence (to perform overhead and waterproofing work) on behalf of contractor.
Stabilize and weatherproof existing building structure
Hs 804-k: removal and reinstallation of roof top hvac equipment, removal and replacement of 2 exhaust fans, split system and provide temporary ac equipment.
Proposed installation of new plumbing fixtures and sprinkler from cellar to roof. plumbing and sprinkler work as perplan. no change in use, egress, or occupancy.
Replacement of 2 condeisng units on the roof with a total capacity of 4.5 tons. no change to egress, use, or occupancy.
Work proposed to show repairs on floors 002-004 due to fire fighting operations: skylight replacement, repair of hole in the roof and minor related renovation as per plans filed herewith . no change i...