Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
Proposed interior renovation, conversion to single family and replacement of roof to an existing 2-story 2-family residence with cellar. proposed change in use group and egress. no proposed change in...
Replace deficient joists wall reinforcement, and new AC dunnage on roof. No change to use, egress or occupancy.
Installation of ballast mounted PV solar energy system on roof. No change of use, egress, or occupancy.
Replace two existing roof top packaged a.c. units at the roof on existing steel supports. replace damaged ducts on the roof.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
New passive recreation roof deck
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 13 modules, 5.33 kw
installation of solar panels, rooftop, railed, grid-tied, 19 modules, 7.79 KW
Filing to amend cofo to include rooftop/play area with protective fences and egress walkways as shown on drawings filed herewith. additionally renovation of the 3rd floor ceiling patches.
Relocate existing roof mounted general exhaust fan and modify associated ductwork; replace roof restroom exhaust fan and modify existing exhaust duct system as per plans filed herewith. no changes to...
Mechanical work to renovate units #1r, 1l, 2r, 2l, 3r, 3l, 4r, 4l &roof. no change to use, egress or occupancy
Plumbing work at basement, 1st, 2nd floors, Roof and osp indicated on drawings filed herewith No change in Use egress or Occupancy under this application
Full renovation to change home from one-family to two-family residence. Work to include update to egress, replacement of windows and roof. Renovation of backyard and addition of non-combustible deck.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Proposed one (1) story masonry and steel joist rear enlargement to existing building with passive recreational roof deck.
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valve...
Replacement of 14 existing roof drains in place as part of roof replacement. The relocation of 5 roof drains away from the wall. All roof drain piping removed and replaced to the first elbow.
Modification to existing VERIZON site on the roof. Installation of 7 antennas, 9 RRH units, 1 GPS antenna and 1 equipment platform with related cabinets. Removal of 1 cabinet, 4 RRH units and 2 antenn...
Interior demolition of non load bearing partitions, lower roof parapet work.