Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
Remove and replace existing roof drains with associated piping. Remove and relocate plumbing vent pipes to be at least 3 feet from the face of any nearby equipment curbs.
CONVERT FROM 3 FAMILY TO 2 FAMILY DWELLING. MINOR PARTITION WORK AT SECOND AND 3RD FLOORs. RECONFIGURE PORTION OF ROOF.
installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.1 KW
Whitman #09, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Whitman #05, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Whitman #09, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is to the top of the sidewalk shed at east, west, north (to main roof level), south (from...
Whitman #01, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Whitman #03, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Steel dunnage for mechanical equipment on the roof and new conveyer opening at 1st floor to the sub-cellar.
Whitman #04, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Remove and replace existing roof drains with associated piping. Remove and relocate plumbing vent pipes to be at least 3 feet from the face of any nearby equipment curbs.
CONVERT FROM 3 FAMILY TO 2 FAMILY DWELLING. MINOR PARTITION WORK AT SECOND AND 3RD FLOORs. RECONFIGURE PORTION OF ROOF.
Rooftop solar installation. no change to use, occupancy or egress.
Remove and replace existing roof drains and connect to existing piping. Remove and replace vents above roof surface to maintain the minimum 24 above finished roof surface
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.