Roofing Permits in Brooklyn, New York
1,373 roofing permits filed recently
1,373 permits
Installation of steel dunnage for installation of new heat pump unit at the main roof as per plans filed herewith. No change to use, egress, or occupancy.
Application filed herewith to do minor apt. partition work in apt. line c only. install new plumbing fixtures. replace windows. repair terra-cotta veneer facade. new re-roofing. no change in use, occu...
Mechanical modifications on 6th floor and roof as shown on plans filed herewith. No change in egress occupancy or use.
K019@PS414K : Installation of Exterior Lighting and Security Lighting at the Basement , 1st floor and Roof.
Minor apt. partition work. repair existing plumbing system. install new plumbing fixtures & kitchen cabinets. replace window steel lintels & windows. rebuild parapet walls & repair masonry facades. ne...
General construction consisting of roof and window replacement, insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy
Application filed herewith to install new bathroom & kitchen roof mounted exhaust ventilators w/ new CAR fire rated damper. Vacuum clean all existing duct work. Change existing shut off and air valve.
K019 @ PS 414K : Repair of Ramps, main Entrance,, Fence & gate; replace Concrete & Asphalt pavement; repair of Reinf. Concrete Floors, Ceilings, walls; Remove, replace Masonry, Concrete and Lime Stone...
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
K019@PS414K : Repair on the Exterior Ramp, Repair on the Main Stair at the main Entrance; Remove & replace a portion of the reinforced concrete floor at the Gymnasium Area; repair & replace a portion...
Scope of work alteration type 2herewith filing to remove existingroof framing to raise height of roofsurface to add a additional 7'-0 inheight. filing for the construction ofa framed roof bulkhead.no...
Rooftop solar installation. no change to use, occupancy or egress.
Sound and repair damaged stucco, repoint brick, repair cracks, replace lintels, repair Sidewalk, remove vegetation from side of walls, replace railing at roof as per plans filed herewith. No change to...
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of steel dunnage for installation of new heat pump unit at the main roof as per plans filed herewith. No change to use, egress, or occupancy.
Installation of steel dunnage for installation of new heat pump unit at the main roof as per plans filed herewith. No change to use, egress, or occupancy.
Parapet replacement cracked & spalled brick replacement waterproof stone panels cut & point brick & stone mortar joints embedded iron & steel fastener removal remove & replace deteriorated steel linte...
Application filed to install new bathroom ceiling mtd. exhaust fan w/ new car fire rated damper& new roof mtd. relieve hood. vacuum clean all exist. duct work. install new roof gravity vents. change e...
Application filed herewith to replace baseboard room heaters, roof exhaust fans and related piping and ducts. no change in use. no change in occupancy. no change in egress. no change in bulk.
Remove and replace roof drains, roof vents, storm and vent piping. Remove and replace gas piping to existing kitchen equipment.