Roofing Permits in Brooklyn, New York
1,391 roofing permits filed recently
1,391 permits
Replacement of ex. main roofing system, membrane flashing, main rof parapet + bulkhead for evironmental bldg (e) of nycct. no change in use, egress or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Ot-gc - filing herewith for the window, roof repairs/replacement and exterior masonry work there will be no change in egress, occupancy or use.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of solar pv system on existing rooftop. no changes to the egress, use or occupancy.
Is 281k - filing herewith the mechanical work asscoiated with the i-1 roof, windows and exterior masonry work. no change in use, egress or occupancy.
Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas) with associated parts, 6 RRH units, 3 GPS units and 1 equipment platform with related cabinets. Related conduits through 1...
Installation of photovoltaic solar array on roof including all related structural work as per plans filed herewith. electrical app# b01337971-i1 filed separately. no changeto use, egress or occupancy.
Roof drain replacement throughout and install 2 new drains on second floor roof
Installation of solar pv system on the existing rooftop and carport. no changes to the egress, use or occupancy
Modification / repair of existing legal, non-conforming indirectly illuminated rooftop advertising sign structure and replace two signs with one. no increase in the degree in non-conformity. no change...
New Boiler install to take place on the roof as per plans filed herewith. No change in use, egress, or occupancy.,
PROPOSED MECHANICAL WORK FOR A SINGLE FAMILY BUILDING. WORK AT CELLAR, BASEMENT, 1st FLOOR TO 3rd FLOOR, PENTHOUSE & ROOF. AS PER PLAN. IN CONJUNCTION WITH DOB NOW GC JOB#: B01333669-I1.
K281 - Remove and replace storm drain piping and roof drains in same location as existing.
Decommission and abandon in place existing indirect domestic water heaters, recirculation pump, and associated piping with valves; provide new domestic water and gas piping from the cel to a new boile...
Rooftop solar installation. no change to use, occupancy or egress.
Decommission and abandon in place existing indirect domestic water heaters, recirculation pump, and associated piping with valves; provide new domestic water and gas piping from the cel to a new boile...
Modification / repair of existing legal, non-conforming indirectly illuminated rooftop advertising sign structure and replace two signs with one. no increase in the degree in non-conformity. no change...
New Boiler install to take place on the roof as per plans filed herewith. No change in use, egress, or occupancy.,
K281 - Remove and replace storm drain piping and roof drains in same location as existing.