Plumbing Permits in Brooklyn, New York
2,534 plumbing permits filed recently
2,534 permits
Subsequent application filed for plumbing work at apartment 1a on 1st floor of existing 4 story residential building. application filed in conjunction with dob now application# b01301914-i1. no change...
Plumbing work filed herewith as indicated on drawings.
Plumbing work filed in conjunction with general construction to Apts. 14E. to replace and install new plumbing fixtures. No new plumbing or gas piping under this application.
Interior renovation within tenant space at Suite 213, new non-loadbearing partitions, paint, and flooring. New plumbing fixtures filed under subsequent plumbing application. No change of use, egress,...
Underground plumbing work in conjunction with NB Construction
Plumbing work including domestic, sanitary & gas service for new 5-story & cellar residential building
Plumbing fit out work for 2 family.
2 bathrooms relocation, 1 kitchen relocation, (2) new 3 comp. sink, (1) relocated hws
Installation of new plumbing fixtures in conjunction with ALT I application #B01250356-I1
Propose plumbing work of commercial kitchen as per plan. No change in use, egress, or occupancy.
existing 3 stories and cellar two family dwelling units to be converted into a one family dwelling unit, and fully renovated. new drywall partitions and plumbing fixtures as per plans. New metal deck...
Subsequent application filed for plumbing work at apartment 1a on 1st floor of existing 4 story residential building. application filed in conjunction with dob now application# b01301914-i1. no change...
Application hereby filed for Plumbing scope details and specifications for modifications to existing plumbing system to accommodate Tenant Fit-out at Cellar and First floor levels in conjunction with...
Mount Sinai Brooklyn Infusion offices - Plumbing modifications on 1st floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Plumbing and sprinkler filing in conjunction with GC B00898026-I1
New installation of plumbing equipment's or fixtures and sprinklers installation.
Renovate the third floor of the existing two family home onthe premises, general construction to include limited removal and construction of non-structural partitions, new lighting, and new plumbing f...
Hereby filing installation of new plumbing fixtures on levels 3-8, as well as new elevator sump pumps on the basement level. there are no new water services or sewage pumps proposed.
Application filing for renovation of the retail space the tiny cupboard. work includes new plumbing fixtures and piping as per architect's plans. there is no change to egress, use or occupancy.
Plumbing and sprinkler scope of work in-conjunction with general construction alt. 1 bis application.