Plumbing Permits in Brooklyn, New York
2,509 plumbing permits filed recently
2,509 permits
File plumbing work to replace plumbing fixtures and gas appliances as per plan. file to resolve ecb violation #39168644h. no change in use, egress or occupancy.
Install new plumbing fixtures at cellar 1st 2nd floor. general construction work was filed under dobnow job#b01327680-i1.
Subsequent filing for plumbing work in conjunction with alteration co application.
Removal & reinstallation of water service throughout existing three (3) dwelling unit, three 3-story with cellar as per plans in conjunction with job # b01302541-i1
Filing herewith plumbing work as per plans filed herewith. No change to use, egress or occupancy. (tenant building out - 451 5th Ave - In Conjunction with ALT-CO B00668652-I1)
File plumbing work for 6-family building with new/replace/relocated plumbing fixtures and gas appliances as per plan. no change of use, egress, or certificate of occupancy.
Here with filing for new installation of plumbing system for 7 story building
Herewith filing application to propose general construction/ renovation for 3 story 3 family dwelling; plumbing filed seperately under b01310100-s1. no change in occupancy, egress or bulk
Cap/remove gas fired water heater and replace with new electric heat pump domestic water heaters.
Plumbing work proposed for a two-family home. no change to use, occupancy or egress.
Submit plumbing plan in conjunction with nb application#b01011329-i1.
Plumbing work associated with new building construction.
Plumbing work at 1st floor as shown on plans
Filing for new plumbing fixtures and cooking equiptments for existing restaurant. no change in use egress or occupancy.
Plumbing work as indicated on the drawings.
Remove (1) sink and (1) 3-pc bathroom; Install (1) lavatory, (1) water closet and (1) shower in the Cellar. To remedy ECB violation #35724804R. No change in use, occupancy or egress.
proposed plumbing in conjunction with nb
Replacement of existing gas piping & risers as per plan. no change in building use occupancy and/or egress under this application.
Installation and replacement of plumbing fixtures for interior renovation, no change to use, egress or occupancy.
Replace existing bathroom tub with shower as indicated on plans. Install new dishwasher and clothes washer.