Other Permits in Brooklyn, New York
6,989 other permits filed recently
6,989 permits
No work is being proposed under this application. alt gc application is being filed in conjunction to bis alt 1 job# 321920025. application filed to create tpp filing to satisfy requirements
Supported scaffold installation as per plans filed herewith.
Filing for the installation of sidewalk shed on behalf of contractor
Installation of 200 ft of Temporary Construction Fence , at the building , No change of Use or Egress Or Occupancy of the building.
28-215.1 Emergency work as directed by DOB. Emergency installation of sidewalk shed due to fire at 3322 & 3334 Church Ave to protect public from falling debris due to fire. No change in use egress,occ...
Temporary sidewalk shed installation and use as per plans filed herewith. no change to use, egress or occupancy.
Proposed cellar, (4) four story and penthouse, (4) family dwelling as per plans filed herewith
Mechanical specifications filed in conjunction with gc application b01325771-i1
Convenience opening in masonry wall between 711 and 713 Brighton Beach Avenue.
Upper vale-exterior landscaping/sitework improvements at prospect park-vale of cashmere. install low fence, exterior railings, pavers, benches, waste receptacles. no change to use, egress, or occupanc...
General construction as well as proposed elevator shaft as per plans submitted.
8' Construction Fence
Application filed herewith to convert an existing 3 story 2 family building into an 8 family
Suspended Scaffold Installation for Facade Restoration and Inspection
Upper vale-civil/sitework improvements at prospect park-vale of cashmere. no change to use, egress, or occupancy.
Proposed horizontal & vertical enlargement to an existing 3 story & cellar building.
Installation of sidewalk shed
Construct one metal outdoor sheds and install one outdoor walk in cooler shed as per plans. no change in use, egress and occupancy under this application.
Soe specifications filed in conjunction with gc application #b01325771-i1.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.