Other Permits in Brooklyn, New York
7,048 other permits filed recently
7,048 permits
Existing two (2) story & cellar two (2) family dwelling converted and enlarged to a four (4) story and cellar one (1) family dwelling
Structural work in conjunction with the vertical enlargement filed under #b01092146-i1
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of nyc code 2022. no change in use, occupancy or egress under this application.
Separation of apartments combined under DOB Job No. 320410845. Work to General Construction to close partition opening for and the reinstallation of a kitchen in apartment 3C in the previous location....
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Mechanical work hereby filed in conjunction with B01238059-I1
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Filing for mechanical work at the 1st floor. No change to use, egress, or occupancy.
Proposed one 7'-0 curb cut with two 1'-6 splays (total of 10 feet), located on the east side of east 93rd street, the distance is 454.50' south of the corner formed by avenue d & east 93rd street.
Installation of 300psf heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
proposed construction fence
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application filed to horizontally enlarge and renovate the existing 3-story + cellar synagogue and dormitory.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th...
Installation of sprinkler heads under a temporary construction scaffolding as per the filed plans. No change to use, occupancy or egress.
P.s. 206-k: subsequent filing of environmental work type for a new school building.
Application filed herewith to vertically and horizontally enlarge an existing two story building. building to be converted into a three story two family building