Other Permits in Brooklyn, New York
7,048 other permits filed recently
7,048 permits
Install Temp system, piping and accessories, demo of piping, team control valve, steam traps, piping and insulation new equipment and accessories condensate return/feedwater, flush and lean radiators,...
Erect fence.
proposed construction fence
Herewith filing for construction of new four story, four family, multiple dwelling
Proposed one 7'-0 curb cut with two 1'-6 splays (total of 10 feet), located on the east side of east 93rd street, the distance is 454.50' south of the corner formed by avenue d & east 93rd street.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th...
Tenant fit-out for Jersey Mike's Subs at this location. No change in use, egress, or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Foundation work in conjunction with new mixed use building
P.s. 206-k: mechanical work type
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
construction fence in conjunction with job 322063422
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Installation of fence for pedestrian and worker safety during construction. fence shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Propose to remove interior partitions and install new split system at 1st floor as per plan. No change in use, egress, or bulk.
Civil earthwork filing