Other Permits in Brooklyn, New York
6,989 other permits filed recently
6,989 permits
1 Story & penthouse addition to existing 3 story and cellar residential building
HEREBY FILING FOR THE REMOVAL AND INSTALLATION OF SPRINKLER HEADS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. (Tenant building out - 449 5th Ave - In Conjunction with ALT-CO B00668652-I1)
Installation of temporary construction fence for ps 262k at 500 macon streetbrooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of floor/ceiling joists and metal stud walls as per drawings herein. no change in use, egress, or occupancy under this application.
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy.
Sprinkler work for tenant fit-out in retail c + d
Installation of temporary pipe scaffold & system scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of 8ft construction Fence.
Filing mechanical application inconjunction with dob now job # b00861013-p2
Application file to exterior facade repais as remove & rebuild parapet wall as per plan. remove violation#35683172j. no change in use, egress or occupancy under this application.
Filing for fence application , installation of 8' - 0'' plywood construction fence.
It is proposed to file for structural work as shown on plans.
Proposed removal of existing portion abutting existing garage. Existing garage to remain.
Proposing a new curb cut for (1) one parking spot. in conjunction with job #321591078
Fence work in conjunction with early foundation work.
Installation of sidewalk shed as per plans. shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.
Herewith filing for sprinkler modifications on 2nd (marketing flr 3), 4th (marketing flr 4), 5th (marketing flr 6) and 9th (marketing flr 10) floors per plans.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code.