Other Permits in Brooklyn, New York
7,047 other permits filed recently
7,047 permits
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal of sprinkler work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Minor partition work with general carpentry work in apt 3. No change to use , bulk or egress.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of supported scaffold for work locations access.
- Install approximately 35 SF of sidewalk shed at the entrance to the property
To file sp work type in conjunction with alt-1 application #b00745770.
Refile existing expired approved plans, show as-built conditions and obtain a new certificate of occupancy
Provide new fire sprinkler system throughout two-story residential building with basement in conjunction with alt co job # b00916283-i1.
Proposed new horizontal enlargement of an existing 4 story building, existing foundation and structure to remain, enlargement to be construction class iii-a and building proposed to be fully sprinkler...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Suspended Scaffold installation and hoist as per plans filed herewith. No change in use, egress and occupancy.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams onfloors 1 thru 3 &...
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams onfloors 1 thru 3 &...
Installation of temporary fence
Suspended Scaffold for Facade Restoration as Shown on Plans
1. install 2 new doors in the 2nd floor as per plan.2. create a new opening in the 2nd floor as per plan.3. remove exist. interior door and close with new wall as per plan.
Temporary storage of equipment on top of heavy duty sidewalk shed. sidewalk shed filed separately. storage shall comply with chapter #33 of the 2022 code.no change in use,occupancy or egress.
Proposed temporary soe work for a (6) stories with pent-house mix-use building and structural reinforced concrete foundation wall with underpinning and self-underpinning construction