Other Permits in Bronx, New York
2,948 other permits filed recently
2,948 permits
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing Mechanical Application Subsequent to primary job number X01265999-I1
Mechanical applicaiton filed herewith in conjunction to alt-co application x01057161-i1
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under th...
Supported Scaffold Installation as per plans filed herewith. No changes in egress, use or occupancy.
Filing to install a construction fence for The Boys Club.
Application herewith filed for temporary construction fence in conjunction with x01025787-i1, x01026044-i1 & x01026084-i1 to be erected on lots 51,52, & 53. no change in occupancy, use, egress or bulk...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
The removal of the existing playground fencing and gates to be replaced with new perforated metal panel fencing and gates in coordination with new footings.
Installation of a temporary wooden construction fence
Replace existing RTU units. There is no change in use, occupancy, or egress.
Replacement of existing storefront systems and exterior windows with new aluminum storefront framing. Installation of EIFS assembly at portions of the exterior faade as shown on drawings. Install new...
Proposed 9 story multiple dwelling building.
Modifications of existing building ventilation system to provide ventilation for all classrooms and offices.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under th...
PAA requested because the SOE drawings have been updated.