Building Permits in ZIP 94105
San Francisco, CA — 256 permits filed recently
256 permits
12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy l...
1st/f: deffered interior only added project scope to pa# 202510288253, 202510248150, 202510207678: barrier removal only at ground fl shower rooms
10th fl - interior scope includes demo of select light fixtures power poles, non-structural walls, partitions, and doors. install of new non-structural partitions, doors, new equipment, fixtures and o...
ground floor ti for suite 1500 to include restroom on 1st floor of an (e) 6 story building. non structural demo, partitions, and (n) act ceiling tile and lighting fixtures, (n) and modified millwork a...
pa#: 202603117343. deferred mech and elect permit.mech demo + install new + relocate existing duct work =air terminals relocate + reuse existing vav boxes. demo and reconnect heating hot water + rehea...
install new electric internally illuminated channel letter address sign (201)
voluntary replacement of (e), currently functioning, obsolete fire alarm control units (facu). internal components are being replaced. (e) cabinets back boxes shall remain as-is and be re-used.facu ar...
11th office partial remodel/retrofit. lighting fixtures & associated circuiting/contros, power & signal devices and associated wiring, including for phone booths. ref 202510318678
2nd & 3rd fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling. ceiling work to remain. no sprinkler work needed (ab017)
1st fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling work to remain. no sprinkler work needed (ab017). improvement for build back under separate permit
4/f: full office t.i, new non-structural partitions, ceilings and finishes, employee break room/pantry
3/f suite 350 - work includes: new partitions, office door and glazing and mill work.
21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345
29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271
8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716
to obtain final inspection for work approved under pa# 202501148268. all work is complete.
3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor.
50th fl - electrical & office retrofit lighting fixtures & associated circuiting/controls, power & signal devices & associated wiring; mechanical: demo & revise existing ductwork & under floor diffuse...
11/f: deferred electrical permit for ti bpa 202512171972. new power and signal devices througthout space. new 2022 t24 compliant lighting and control.
b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of exis...