Building Permits in ZIP 94105
San Francisco, CA — 256 permits filed recently
256 permits
floor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017.
21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanical.
4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affe...
rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246)
revision 202603026778- remove failing eqipment and perform emergency repair work by replacing with (n) fillport equipment.
relocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas at 6th floor to roo...
24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160
5/f: new phone booths added to (e) space.
6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct
level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331)
revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931
revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilings
5th floor: interior tenant improvement work including selective non-strucutral demolition and new interior construction. scope includes new partitions, ceilings, lighting, power/data layout, and finis...
provision and installation of 4 shield 30 sroiv remote call stations on 8th fl lowrise and midrise elevator lobbies, 21st fl high rise elevator lobby and 29th fl high rise elevator lobby. provision an...
unit 302: remodel 1 bathroom like for like, replace finishes and fixtures, same size and location. no change of use.
27th floor - architectural only office ti. new partitions & millwork. mep deferred.
remove verizon equipment only & antannas from roof of the building & disconnect power & fiber
install 3 illuminated single faced wall sign "jp morgan chase" 32" x 229"
6th floor:ref permit#202603117365, defered mep, demo, install new & relocate existing ductwork & air terminals, relocate & reuse existing vav boxes. electrical lighting fixtures & assoc. circuiting/co...
lobby renovation: interior improvement to the lobby of (e) residential building. scope includes: demolition of (e) walls and finishes, construction of new enclosed leasing office (finishes, walls and...