Building Permits in ZIP 11692
Queens, NY — 73 permits filed recently
73 permits
Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes, chapter 33. No change in use, egress or occupancy.
Facade repair as per plan.
Installation of light duty side walk shed.as per plan.
Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes, chapter 33. No change in use, egress or occupancy.
Structural work as shown on the plans
Structural work as shown on the plans
Repairs, as needed, for structural elements exposed during replacement of exterior masonry.
Renovation of ext'g dunkin'/baskin robins store. replace ext'g floor, cl'g, & wall finishes as needed. update lit'g fix't w/ new as needed. install new millwork as needed. no change in use, egress, or...
Herewith filing for the installation of a sprinkler/standpipe system.
The project scope is the construction of an protected opening at the lot line between 348 Beach 74 Street and 73-03 Blvd. No change in use, egress, or occupancy.
Renovation of ext'g dunkin'/baskin robins store. replace ext'g floor, cl'g, & wall finishes as needed. update lit'g fix't w/ new as needed. install new millwork as needed. no change in use, egress, or...
Herewith filing for the installation of a sprinkler/standpipe system.
The project scope is the construction of an protected opening at the lot line between 348 Beach 74 Street and 73-03 Blvd. No change in use, egress, or occupancy.
Repairs, as needed, for structural elements exposed during replacement of exterior masonry.
Install approx. 1,780 lf of supported scaffold at a max height of 105ft around ps42(q0 school building and rear courtyards
Install 1,120 LF of Temporary Sidewalk Shed Around PS 42(Q) School Building In Conjunction w./ DOB Job #Q00642603
Install 1150 lf of construction fence around ps 42(q) school building
Selective face brick replacement at Exterior Masonry and Parapets; selective repairs; window replacement
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Install approx. 1,780 lf of supported scaffold at a max height of 105ft around ps42(q0 school building and rear courtyards